Mumbai Airport Runways Shut for 6 Hours on November 19
Mumbai's CSMIA will suspend runway operations from 11 AM to 5 PM on November 19 for its yearly post-monsoon maintenance. Both runways will get inspections, surface repairs and technical checks. Airlines have been told in advance so they can adjust their flight schedules.
Context
Airports schedule maintenance after the monsoon, when heavy rain can wear down runway surfaces. Travellers flying through Mumbai in that window should check with their airline for changed flight timings.
Burning Potato score: 63%